Subestación 400 kV Amman East

 

The scope includes the engineering, supply, construction and operation of a new 400 kV substation with the following configuration:

  • 3 generation transformation bays
  • 4 full line bays
  • 1 double busbar coupling
  • 2 future line bays
  • 2 busbars (main and reserve)