
Modifications to the control room.
Supply, installation and wiring of power distribution panels.
Encapsulation of the PL-80 voltage regulator and improvements to the hydrogen station.
Supply, installation and wiring of CL-566 and CL-567 local panels.
Plant simulator and control room tests.
E&I installations for Groups I and II.
Supply, installation and wiring of EMD for refuelling Group I.
Instrumentation installations.

