Puente Champlain

 

The construction of the 3.3 km Champlain cable-stayed bridge includes three lanes in each direction and a centre lane for a future light rail, together with access ramps from the north and south. CYMI has executed all electrical installations for the bridge and its access points, including architectural lighting under the bridge, fibreglass conduits to power utilities, LED streetlights on the sides and centre, and electrical panels inside the bridge. Additionally, CYMI commissions the installation and supervises the programming of the architectural lighting of the bridge, as well as the installation of all streetlights and signage at the access points.