mina las cruces

 

Electromechanical assembly of the plant. It included the installation of 7,038 metres of HDPE piping for drainage and services, 7,000 tonnes of mechanical equipment, steel and FRP tanks, dust suppression systems, 80,000 inches of HDPE and FRP pipes and valves, 600,000 metres of electrical cables and 1,312 instruments. Functional and pre-commissioning tests were also carried out.