Planta Nuclear de Santa María de Garoña

 

  • Supply, installation and connection of control panels: Ensuring that control panels are properly supplied, installed and connected to maintain operational efficiency.
  • Transformer replacement: Replacement of transformer TRF-E2-5E-0-TR and coupling between 400V busbars E1 and E2.
  • Instrumentation panels: Supply, installation and connection of instrumentation panels (PNL-3011 A/B) to improve monitoring and control capabilities.