This project involves the engineering, procurement and construction (EPC) of three key components:

  • Two transmission lines: Operating at 400/230 kV with a total length of 19.4 km.
  • One substation: Operating at 400/230/13.8 kV with a capacity of 500 MVA and equipped with six high voltage feeders.